MARILLA POOL WATER SLIDES
Refurbishment of the water slides at Marilla Pool was completed in the Fall of 2018 in order to make the slides "season ready" for summer 2019.
Scope of Work -
Removing and rebuilding several layers of slide material in multiple locations, sanding and refinishing both inside and out, as well as applying a specialized gel-coat on the interior of the slides for ease of movement.
Budget -
Refurbish and Refinish Slides $71,000
Scope of Work -
Removing and rebuilding several layers of slide material in multiple locations, sanding and refinishing both inside and out, as well as applying a specialized gel-coat on the interior of the slides for ease of movement.
Budget -
Refurbish and Refinish Slides $71,000