Refurbishment of the water slides at Marilla Pool was completed in the Fall of 2018 in order to make the slides "season ready" for summer 2019.
Scope of Work -
Removing and rebuilding several layers of slide material in multiple locations, sanding and refinishing both inside and out, as well as applying a specialized gel-coat on the interior of the slides for ease of movement.
Budget -
Refurbish and Refinish Slides $71,000
Scope of Work -
Removing and rebuilding several layers of slide material in multiple locations, sanding and refinishing both inside and out, as well as applying a specialized gel-coat on the interior of the slides for ease of movement.
Budget -
Refurbish and Refinish Slides $71,000